精品国产乱码久久久久久婷婷,国产传媒精品,亚洲AV日韩综合一区,久久国产成人

Industry information Installation and working engineering of coal powder sampler源頭廠家規(guī)格參數(shù)
Your location : Home > News > Industry information

Installation and working engineering of coal powder sampler

time:2023-11-25 22:32:14Views:

Installation instructions for mobile coal powder sampler and coal powder sampling device:


The installation and operation of the coal powder sampler and mobile coal powder sampler of Lianyungang Lingdong Electromechanical Equipment Co., Ltd. drill holes on the flue, extend the sampling tube into the flue, and make the sampling head face the direction of the incoming smoke flow. (Depending on the situation, the manufacturer can provide their own anti wear sleeve) Weld the sealing flange to the flue and ensure sealing with the sampling pipe. Connect the sampling tube to the cyclone collector with a nut. Connect the cyclone collector to the outlet pipe and valve, and then connect the sampling system to a certain position behind the baffle plate of the induced draft fan through a conduit (i.e. open a hole here. Weld the conduit). Insulate the sampling system (outside the flue) and the entire collector to prevent condensation from blocking the pipeline after sampling.

1-241110194620F4.webp

1-241110194620F4.webp

1-241110194620F4.webp


Mobile coal powder sampler, coal powder sampling device working process:


After the smoke flow enters the sampling nozzle, it passes through the sampling tube and enters the cyclone separator along the tangential direction of the wall. Rotate upwards and downwards along the wall of the device. During the rotation process, the fly ash is thrown onto the device wall due to inertial force, and falls into the ash collection hopper along the device wall through force, entering the sampling bottle, while the gas is discharged through the outlet pipe. When the flue gas flow rate is within the range of 6m/s-14m/s and the constant velocity sampling rate is greater than 95%, the sampler can also be powered by an air pump and can operate intermittently. Within the range of 70% of the unit load, it has the function of constant velocity adjustment. Reliable operation, convenient operation, and requires human maintenance. Mobile coal powder sampler - generally installed on the flue of the air preheater. If the flue width is greater than 2m, two samplers should be symmetrically installed on the flue. If the width is less than 2m, only one sampler should be installed. The pipe joints used for connection type transition are all equipped with water heating equipment- Some movable joints should be installed between them for easy disassembly and assembly, and welding parts should be minimized as much as possible. Connection welding requirements - closed.


產(chǎn)品動態(tài)

Installation and working engineering of coal powder sampler源頭廠家Copyright ? 2012-2023 Lianyungang Lingdong Electromechanical Equipment Co., Ltd all rights reserved

Tel

0518-85370171

天天射天天射| 成人无码区免费a∨| 成人免费看吃奶视频网站| 久久国产精品成人片免费| 国产 精品 自在 线免费| 狠狠躁夜夜躁人人爽超碰女h| xxxx互换人妻ccwww| 亚洲男女一区二区三区| 国产精品嫩草影院av蜜臀 | 韩国理伦三级做爰观看| 成人无码精品一区二区三区亚洲区 | www.一区二区| 午夜影片| 国产午夜精品一区二区三区视频| 亚洲国产成人片在线观看无码| 苍溪县| 四虎人妻| 国产成人高清| 国产三级片在线观看| 免费A级毛片| A级毛片无码久久精品免费| 亚洲av成人午夜福利在线观看 | 91caoporn偷拍熟女在线| 国产欧美精品国产国产专区| 精品一区二区三区久久久| 韩日在线视频| 80电影天堂网| 国产在线拍揄自揄视精品| 国产精品丝袜黑色高跟鞋无码| 最刺激黄A大片免费观看下载| 欧美精品XXXXBBBB| 综合五月激情二区视频| 亚洲综合激情五月丁香六月| 宁城县| 好男人www在线社区| 动漫成人无码精品一区二区三区| 99精产国品一二三产区区别网站| 国产婷婷色一区二区三区| 99色综合| 亚洲精品色在线网站| 人妻夜夜爽天天爽|